Saturday, July 4, 2009

Plans to build .....

Dear friends and family,

Thank you for visiting the site of our wedding. We will be married on August 4, 2009 at Saltry Cove. In the summer of 2010, we plan to build our bedroom cabin. The main, existing cabin will remain as the communal living space with kitchen and dining room. Our cabin will be our own private space, that we have designed and planned. We will be purchasing building materials from a local mill in Thorn Bay (approximately 10 miles from Saltry Cove) and will bring them by boat to Saltry Cove. The materials listed below are the building supplies we will need for the cabin. If you wish to purchase part of our cabin as a wedding gift, please send a check to:

Corrina Batten
518 E. 9th Ave.
Anchorage, AK 99501

Be sure to write what item you are purchasing on the subject line.
  • 2 Pre-hung doors ...............................................$250 ea.
  • 6 Windows ..........................................................$200 ea.
  • 12 8" Sono Tubes ................................................$32 ea.
  • 36 bags of concrete .............................................$10 ea.
  • 2 24ft. beams (8" x 10") ....................................$200 ea.
  • 320 8" milled logs (for walls) .........................$30 ea.
  • 144 1.5" Tongue & Groove decking ................$8 ea.
  • 16 Sheets Metal Roofing ...................................$75 ea.
  • 100 2"x6" lumber (for framing roof and decking) ...$6 ea.
  • 1,000 roofing screws ....................................................$80
  • Mscellaneous hardware (screws, nails, etc.) .............$200

No comments:

Post a Comment